Announcing the Clinic to Employees
2022/06/14
Crystal Cabinet’s President Dennis Palkert announced to employees during all-hands meetings Crystal’s intent to open a clinic for employees and their family members.
Interior and Exterior Photos
2022/08/15
These photos were taken of the clinic before design and renovations began.
Interior re-design Finishes & Demolition begins
2022/10/31
These images are of the re-design of the clinic interior and of the offices. With this complete construction will truly begin.
Interior CONSTRUCTION Begins
2022/12/08
New rooms and walls have been added with the drywalling well underway. The floor was also shaved level for new flooring and carpeting.
Interior construction, lighting, and Paint
2023/01/19
Drywalling is complete along with new lighting being installed. A railing is being installed in the upstairs and painting is underway.
Flooring install and Cabinets Delivered
2023/02/09
Flooring is starting to be installed in the clinic and Crystal Cabinets have been delivered and are ready to be installed.
Flooring and Cabinets installed
2023/02/21