CRYSTAL FAMILY CARE CLINIC

Opening Date: April 3, 2023

Announcing the Clinic to Employees

2022/06/14

Crystal Cabinet’s President Dennis Palkert announced to employees during all-hands meetings Crystal’s intent to open a clinic for employees and their family members.

Interior and Exterior Photos

2022/08/15

These photos were taken of the clinic before design and renovations began.

Interior re-design Finishes & Demolition begins

2022/10/31

These images are of the re-design of the clinic interior and of the offices. With this complete construction will truly begin.

Interior CONSTRUCTION Begins

2022/12/08

New rooms and walls have been added with the drywalling well underway. The floor was also shaved level for new flooring and carpeting.

Interior construction, lighting, and Paint

2023/01/19

Drywalling is complete along with new lighting being installed. A railing is being installed in the upstairs and painting is underway. 

Flooring install and Cabinets Delivered

2023/02/09

Flooring is starting to be installed in the clinic and Crystal Cabinets have been delivered and are ready to be installed.

Flooring and Cabinets installed

2023/02/21

Flooring is installed in the front lobby/hallways and Cabinets have been installed in multiple rooms. Bathroom plumbing has also been finished.